This reference article includes over 170 example prompts for working with Smartsheet using natural language in Smart Assist or Smartsheet MCP-enabled AI tools, such as Claude, ChatGPT, Microsoft 365 Copilot, and Gemini Enterprise Plus.
USM Content
Smart Assist requires a Pro, Business, Enterprise, or Advanced Work Management plan. MCP-enabled AI tools require a Business, Enterprise, or Advanced Work Management plan.
Use the example prompts to surface at-risk items, summarize project and portfolio activity, prepare reports and meeting agendas, manage team workload, improve data quality, and more. And when you’re ready to try sequencing prompts, you can explore Multi-step workflow chains.
For information about AI-powered chat tools you can use with Smartsheet, refer to Conversational AI: Smart Assist and MCP.
Before you begin
Keep the following ideas in mind as you browse this article and work with the prompts:
- The prompts are categorized by work objective. The categories are listed in the table of contents, to the left of the article body.
- Each prompt uses example item names and values. Replace them with names and values that fit the work you’re doing.
- For work that involves multiple changes, refer to the Best practices for previewing changes with prompts.
The example prompts execute operations on Smartsheet data via the Smartsheet MCP Server. These operations are known as the Smartsheet MCP Server’s tools (or MCP tools). For details on the MCP tools, visit Smartsheet MCP server tools.
Enjoy using the example prompts!
Risk and early warning
The prompts in this category identify risks and warn teammates about items at risk.
Detect and call out slipping items
What's about to slip in the next 2 weeks?Smartsheet scans due dates vs current status, and groups items by severity.
Follow-up: mark the items with a warning:
Update those 4 items to At Risk statusThe at-risk items now have the status value “At Risk".
Identify overdue tasks and their owners, and track days overdue
Show me everything that's overdue and who owns itSmartsheet filters for Due Date \< today, Status ≠ Complete, and groups results by owner.
Follow-up: add a column that tracks the number of days each item is overdue.
Add a 'Days Overdue' column with calculated valuesYour sheet's new Days Overdue column indicates the number of days (if any) that each task is overdue.
Attach a blocker email to each at-risk row
Attach the vendor's blocker email to each at-risk rowBinds the supporting evidence to the rows it affects.
Follow-up: Summarize the pattern from blocked row attachments
Pull the proof attached to each blocked row and summarize the patternReads existing row attachments to find the common cause.
Reporting and communication
The prompts below help you prepare reports, emails, and meeting agendas based on project and portfolio status.
Write a status update for your manager
Write a 3-bullet status update for my managerProgress, blockers, next steps — synthesized from live data.
Draft a project progress email
Draft a stakeholder email about project progressSmartsheet drafts a professional, formatted email with a subject line, context, and a set of questions.
Generate an update to post to the team on Slack
Give me a Slack-ready update for the team channelCasual, scannable, under 200 words.
Prepare talking points for Monday standup
Prep me for my Monday standupBlocked items, what's due this week, team status.
Follow-up: Scan discussions for blocker mentions
Check discussions for blockers worth mentioningIdentify the top five sprint wins
What are the top 5 wins from this sprint?Recently completed items ranked by priority/impact.
Generate a weekly project change log
Create a weekly change log for this projectUses cell history to show what changed, who changed it, when.
Follow-up: Stamp a "Last Reported" date on rows
Add a 'Last Reported' column and update itSummarize all workspace projects as portfolio view
Summarize all projects in my workspace as a portfolio viewBrowses workspace, pulls each sheet, synthesizes across all.
Follow-up: Create a consolidated portfolio dashboard sheet
Create a consolidated dashboard sheetDraft an escalation email about blocked items
Draft an escalation email about the blocked itemsPulls blocked items, includes specifics, professional tone.
Identify highlights for a board presentation
What should I highlight in my board presentation?Key metrics, risks, wins — formatted for executive audience.
Generate data-backed one-on-one talking points
Give me talking points for my 1:1 with theData-backed talking points with specific numbers.
Draft a status email from a portfolio report
Pull the portfolio report and draft a status email from itUses cross-sheet report data to compose executive communication.
Summarize key metrics from an executive dashboard
What does my executive dashboard show? Summarize the key metrics.Reads dashboard structure and widget data for synthesis.
Pull source files and integrate into report
Pull the source files referenced on this sheet and incorporate them into the reportFinds attached evidence and integrates it into the narrative.
Attach a sent status email as proof of send
After sending the status email, attach a copy to the sheet as proof of sendAnchors the communication artifact to the work it described.
Build a stakeholder report with linked supporting docs
Build a stakeholder-ready report and link the supporting docs row by rowSynthesizes findings then attaches evidence to each row referenced.
Decision support
The following prompts assess capacity, project health, bottlenecks, trade-offs, dependencies, and resource reallocation options.
Check team capacity for a new project
Do we have capacity for a new project? Show workloads.Counts active items per person across sheets.
Follow-up: Suggest low-priority items to deprioritize
What could we deprioritize to make room?Compare the health of two projects side by side
Compare Project A and Project B health side by sidePulls both, compares % complete, risks, team allocation.
Follow-up: Create a project comparison sheet
Create a comparison sheetAssess whether a project needs escalation
Should we escalate this project? Give me the evidence.Assembles overdue count, blocked count, budget burn rate.
Identify the bottleneck across active projects
Who's the bottleneck across our active projects?Cross-project owner analysis — finds over-committed people.
Follow-up: Reassign lower-priority tasks from overloaded person
Reassign 3 of their lower-priority tasksRank projects by health and risk level
Which project is healthiest and which needs the most attention?Portfolio-level ranking by completion rate, risk count, freshness.
Calculate sprint velocity and improvement trend
What's our sprint velocity? Are we improving?Counts completed items per sprint, shows trend.
Show what gets dropped with a 20% scope cut
Show trade-offs: if we cut scope by 20%, what do we drop?Ranks by priority, shows what's lowest impact.
Follow-up: Move low-priority items to a backlog status
Move those items to a Backlog statusFind the most impactful cross-project dependencies
What are the top dependencies blocking the most work?Analyzes blocker reasons and predecessor relationships.
Model reallocation options from a resource report
Use the resource report to model reallocation optionsPulls report for cross-sheet resource view, identifies flexibility.
Compare dashboard metrics against raw sheet data
What do the dashboards show vs what the raw sheets say?Compares dashboard-level metrics against source sheet reality.
Pull supporting docs before making a decision
Pull the supporting docs attached to each option before I decideSurfaces evidence trail for each row in a decision matrix.
Build a decision sheet with attached source proposals
Build the decision sheet and attach the source proposals to each rowCreates the comparison structure with evidence baked in.
Scenario planning
Use the following prompts to explore what-if scenarios against your live project timelines and resource capacity, and execute the best path forward.
Supported plans: Enterprise, Advanced Work Management
List scenario plans in a workspace
List the scenario plans in workspace XYZ.
General scenario plan information, including the names and IDs of the scenario plans in the current workspace, appears.
Create a scenario plan
Prerequisite: Workload Planning is enabled for all of the source sheets in the plan.
Create a scenario plan in the workspace.
Creates a scenario plan that includes a baseline composed of up to five project sheets.
Create a scenario
Create a scenario called XYZ in the scenario plan.
Adds a scenario with that name to the scenario plan.
Update a scenario
In scenario XYZ, assign the “Design 1” and “Design 2” tasks assigned to John Doe in “Project A” to Jane Roe.
The tasks are assigned to Jane Roe in that project in the scenario.
Show diffs between a scenario and the original projects
What are the task differences between the XYZ scenario and the original sheets?
A summary and task-difference descriptions appear, including any task-predecessor remappings.
Compare high-level scenario metrics
Compare the scenarios in this scenario plan.
Returns the capacity (available hours) and workload (assigned hours) for the scenarios over a date range, highlights risks, calls out over- and under-capacity users, and suggests actions to reduce risk.
Get user capacity and workload data
Show the capacity and workload of the users in scenario XYZ.
Returns capacity (available hours) and workload (assigned hours) for a scenario over a specified date range, broken down by time bucket and grouped by user, discipline, or role.
Follow-up: Filter results on a group.
Filter data to focus only on group XYZ.
Follow-up: Filter results on a discipline.
Filter data to focus only on discipline XYZ.
Follow-up: Filter results on specific users.
Filter data to focus only on John Doe and Jane Doe.
Follow-up: Change the time unit range.
Show me the weekly data instead of the monthly data.Apply a scenario to the original projects
Apply the changes of scenario XYZ.
All of the changes from the scenario are applied to the project sheets.
Automate workflows
The following prompts help you list, create, activate/deactivate, and delete workflows from a sheet.
See what's automated on a sheet
What automations are running on this sheet?Lists workflow with its full trigger, condition, and action tree
Build a notification workflow for status changes
When Status changes to At Risk, email the project ownerCreates a row-change trigger paired with a notification action.
Route new rows for approval
When a new row is added to Vendor Requests, send it to Susan for approvalCreates an approval workflow with a recipient and approve/reject routing.
Follow-up: turn it off without losing the setup:
Disable that approval workflow. The workflow stops triggering but can be re-enabled later.
Permanently remove a workflow
Delete the outdated escalation workflow on this sheetRemoves the workflow after confirmation.
This can’t be undone. Disable it instead if you might need it again.
Chain multiple actions from one trigger
When a task is marked Complete, lock the row and record today's date in the Completed Date columnBuilds a single workflow with two actions triggered by the same condition.
Scheduled and recurring automation
Use these prompts to trigger reminders, update requests, and checks on a recurring cadence or relative to dates already in your sheet.
Remind assignees ahead of a due date
Three days before the Due Date on each row, remind the assigneeCreates a trigger tied to a date column rather than a fixed calendar date.
Send a recurring update request
Every Monday at 8am, send an update request to owners of In Progress rowsCreates a weekly recurring trigger paired with an update-request action.
Flag a fixed date across the sheet
On December 1st, notify everyone on the Renewals sheet that contracts are upCreates a one-time (or annual) fixed-date trigger.
Row lifecycle automation
The following prompts automatically move, copy, assign, and clean up rows as they progress through the process, rather than requiring a follow-up prompt each time.
Archive completed rows automatically
When a row is marked Done, move it to the Archive sheetCreates a move-row action triggered by the status change.
Mirror rows into a second sheet instead of moving them
When a row is marked Done, copy it to the Completed Archive sheetKeeps the original row in place while duplicating it elsewhere.
Auto-assign based on priority
When Priority is set to Critical, assign the row to our on-call engineer's contact columnCreates an assign-people action tied to a priority condition.
Clear stale fields on completion
When a task is marked Complete, clear the Blocker Reason cellPrevents old blocker text from carrying forward on resolved items.
Generate a document when a stage is reached
When an order is marked Approved, generate a contract from our template mappingFires a document-generation action from an existing document mapping.
Follow-up: protect it once it's final:
Once the contract is generated, lock the rowAdds a lock-row action so approved orders can't be edited afterward.
Team and productivity
The following prompts surface blocked owners, workloads, overdue tasks, velocity, reassignments, and team accomplishments.
List who is blocked for standup context
Who's blocked right now? I need standup context.Blocked items with owners and blocker reasons.
Follow-up: Pull row discussions for blocker context
Pull the row discussions for contextShow today's tasks grouped by owner
What's due today and who owns it?Today's items grouped by owner.
Show all of Sarah's incomplete tasks
Show me Sarah's workload All incomplete tasks assigned to Sarah.
Follow-up: Reassign Sarah's urgent tasks to Mike
Reassign her 5 urgent tasks to MikeShow who is overloaded this sprint
Who's overloaded this sprint?Active task count per person.
Summarize last week's team accomplishments
What did the team accomplish last week?Completed items grouped by person, sorted by date.
Add five new tasks to the sprint board
Add these 5 tasks to the sprint boardCreates rows with names, owners, dates, status.
Mark all of Jake's tasks as Done
Mark all of Jake's completed tasks as DoneFinds Jake's completed items, updates status.
Find if blocked items share a common dependency
Do blocked items share a common dependency?Cross-references blocker reasons across blocked items.
Calculate team velocity across three sprints
Calculate team velocity for the last 3 sprintsCounts completions per sprint, shows trend.
Find who hasn't updated tasks recently
Who hasn't updated their tasks in 2+ weeks?Uses modification dates to find stale owners.
Comment on reassignment rationale on affected rows
After reassigning tasks, comment on each with the reasonDocuments reassignment rationale for each affected row.
Start daily update discussions with blocked owners
Start a discussion thread asking blocked owners for daily updatesCreates targeted discussions on blocked rows requesting status.
Attach yesterday's standup notes to today's row
Attach the meeting notes from yesterday's standup to today's standup rowBinds running context to the recurring artifact.
Pull spec docs attached to each sprint task
Pull the spec docs attached to each task in this sprintGathers all per-row evidence for sprint review prep.
Data quality and governance
The following prompts audit missing values, duplicates, invalid dropdowns, stale sheets, column usage, and change history.
Audit a sheet
Does this sheet look healthy?Surfaces the following issues:
- Missing fields
- Inconsistencies
- Duplicates
- Stale rows
It describes each issue, summarizes them, and suggests resolution steps that you can execute in follow-up prompts.
Find rows missing owner, due date, or priority
Find rows missing an owner, due date, or priorityAudits null values in key columns.
Follow-up: Set the missing priorities to Medium by default
Set the 8 missing priorities to MediumDetect duplicate rows in the sheet
Are there duplicate rows in this sheet?Scans for identical task names or matching key fields.
Follow-up: Delete identified duplicate rows
Delete the 3 duplicatesFind values not matching the dropdown options
Show me values that don't match the dropdown optionsCompares column dropdown definitions vs actual values.
Follow-up: Standardize status values across all rows
Standardize 'Done' to 'Complete' across all rowsRun data quality audit across entire workspace
Run the same audit across all sheets in this workspaceBrowses workspace, audits each sheet, consolidates findings.
Add a governance Last Reviewed date column
Add a 'Last Reviewed' column for governance trackingCreates a date column.
Follow-up: Set today's date for all active rows
Set today's date for all active rowsFlag regulatory requirements
Are there any projects with regulatory or compliance requirements?Identifies projects with regulatory or compliance requirements, describes the requirements found in each project, and suggests steps to address the requirements.
Identify columns with no data in any row
Which columns are unused — no data in any row?Scans for empty columns that might be obsolete.
Follow-up: Delete identified empty columns
Delete the 2 empty columnsShow who last modified each row and when
Show me who modified each row last, and whenUses cell history for audit trail.
Add "On Hold" to the Status dropdown
Update the Status dropdown to add 'On Hold' as an optionModifies column configuration.
Comment on each fixed row after cleanup
After cleaning up data issues, comment on each fixed rowDocuments what was changed and why on each affected row.
Verify data fixes using a cross-sheet report
Verify fixes against the cross-sheet reportRe-pulls report data to confirm source sheets now pass audit.
Attach an audit log before and after cleanup
Attach the audit log doc to the sheet before and after the cleanupCreates a verifiable governance trail.
Capture the sheet version before and after cleanup
Capture the sheet version before and after the cleanup, then confirm only my changes landedVersion-pinned write — proves no concurrent edits collided.
Find sheets inactive in last ninety days
Find sheets with no Last Reviewed activity in the last 90 daysWorkspace-wide governance sweep using sheet metadata.
Setup and structure
The following prompts create and configure sheets, columns, workspaces, folders, and templates from scratch or existing structures.
Create a new project tracker with standard columns
Create a new project tracker with standard columnsCreates sheet with Task, Owner, Status, Priority, Due Date, Notes.
Follow-up: Populate the tracker with starter tasks from a plan
Add 10 starter tasks from my planSet up a sprint board from an agile template
Set up a sprint board from the agile templateCreates sheet from template with sprint-ready columns.
Create a new workspace for Q2 initiatives
Create a new workspace for Q2 initiativesCreates workspace, then can create folders and sheets inside.
Follow-up: Create folders for each workstream inside the workspace
Create folders for each workstreamOrganize workspace into department-based folders
Organize my workspace — create folders by departmentCreates nested folder structure.
Add a Priority dropdown column to sheet
Add a Priority column with High/Medium/Low optionsAdds dropdown column with defined options.
Rename the Assigned column to Owner
Rename the 'Assigned' column to 'Owner'Updates column properties.
Delete the deprecated Phase column
Remove the deprecated 'Phase' columnDeletes column after confirmation.
Build a budget tracking sheet from scratch
Build me a budget tracking sheet from scratchCreates sheet with budget-specific columns.
Follow-up: Add department-specific line items to a budget
Add line items for each departmentClone the current project structure for a new engagement
Clone this project structure for a new engagementCreates from template, populates with new details.
Create a tracker with a project brief and spec attached
Create a new tracker and attach the project brief and spec to itNew sheet ships with its source-of-truth docs already bound.
Bootstrap an engagement workspace with folders and sheets
Set up the engagement workspace with folders and starter sheetsFull bootstrap: workspace → folders → sheets in one chain.
List available templates for new sheets
What templates are available for new sheets?Explains template options and creation patterns.
Onboarding and exploration
The following prompts explain sheet structure, status values, hierarchy, assets, and overall Smartsheet capabilities to new users.
Explain what a sheet tracks and how
Walk me through what this sheet tracksExplains column structure, data patterns, hierarchy.
List all accessible workspaces and their contents
What workspaces do I have access to?Lists workspaces and their contents.
Explain the meaning of sheet status values
What do the status values in this sheet mean?Pulls dropdown options and explains the workflow.
Describe what you can do with my Smartsheet data
What can you do with my Smartsheet data?Explains full capability: read, write, create, discuss, attach, reports, dashboards.
Browse the contents of a Marketing workspace
Show me what's inside the Marketing workspaceBrowses workspace contents: sheets, folders, reports, dashboards.
Explain a sheet's row hierarchy and indentation structure
How is this sheet organized — parents and children?Explains row hierarchy and indentation patterns.
List accessible dashboards
What dashboards do I have access to?Lists all accessible dashboards with names and modification dates.
List all accessible reports
What reports are available to me?Lists all accessible reports for cross-sheet analysis.
Show the full picture of my sheets, reports, and dashboards
Show me the full picture: sheets, reports, dashboards, and attachmentsCombines workspace browse with full asset listings.
Explain how a report differs from its source sheet
How is this report different from the source sheet?Explains report as read-only cross-sheet view vs editable source.
Inventory attached files and their relevance
What files are attached to this sheet, and what do they cover?Inventories the evidence and explains its relevance.
Check a sheet's version and change frequency
What version is this sheet at, and how often is it changing?Lightweight activity check using version number.
Cross-project and portfolio
The following prompts surface priorities, conflicts, over-commitments, and portfolio summaries across multiple projects and workspaces.
Show high-priority items across top projects
Show all High priority items across my top 5 projectsSearches across sheets, filters by priority.
Follow-up: Build a consolidated cross-project tracker sheet
Build a consolidated tracker sheetFind people over-committed across multiple projects
Where is the same person over-committed across projects?Cross-references assignees across multiple sheets.
Search all sheets mentioning a keyword
Find all sheets that mention 'Q2 launch'Keyword search across workspaces.
Detect timeline conflicts across projects
Are there timeline conflicts between these 3 projects?Compares dates and dependencies across sheets.
Aggregate active projects into portfolio summary sheet
Create a portfolio summary sheet from all active projectsAggregates key metrics into new sheet.
Map all workspaces, folders, and sheets
What does our complete workspace structure look like?Maps all workspaces, folders, and sheets as a tree.
Use a portfolio report instead of reading each sheet
Pull the portfolio report instead of reading each sheetUses cross-sheet report for efficient multi-project analysis.
Validate report findings against dashboard metrics
Cross-reference the report findings with dashboard metricsValidates report data against dashboard widgets for consistency.
Find sheets with the same vendor doc attached
Find every sheet across the portfolio that has the same vendor doc attachedCross-portfolio attachment scan — find shared evidence.
Build a portfolio tracker linking to each project sheet
Build a portfolio tracker with each row linked to its source project sheetCreates a navigable index using sheet URLs as row attachments.
Bulk actions and modifications
For any bulk write touching more than 25 rows, see Best practices for bulk changes with prompts first. The patterns there reduce risk to near zero.
Batch-update all completed Q4 tasks to Done
Mark all completed Q4 tasks as DoneFinds and batch-updates status.
Set the priority High for tasks due next week
Set all tasks due next week to High priorityDate-filtered batch priority update.
Bulk transfer all tasks from Alex to Jordan
Reassign everything from Alex to JordanBulk owner transfer.
Delete all rows with Cancelled status
Delete all rows with status 'Cancelled'Finds and removes cancelled items (with confirmation).
Create twenty rows from a provided task list
Add 20 tasks from this list I'll give youBatch row creation from user-provided data.
Transition all Backlog items to In Progress
Move all 'Backlog' items to 'In Progress'Status transition for a batch of items.
Timestamp the Reviewed column for all active rows
Set today's date in the 'Reviewed' column for all active rowsGovernance timestamp batch update.
Clear the Notes column for completed rows
Clear the Notes column for all completed itemsBatch cell clearing.
Test bulk update on one row first
Run that bulk update on one row first as a canary, then the restSample-of-one staging — verify behavior on a single row before scaling.
Version-pin a sheet, update it, and confirm your changes
Pin the sheet version, run the bulk update, confirm only my changes landedVersion-pinned write — detects concurrent edits.
Preview filter scope and diff before a bulk write
Show me the exact filter scope and the old→new diff before I confirm the bulk writeFilter-then-confirm dry run pattern.
Discussions and context
The following prompts summarize, create, and update discussion threads, extract decisions, and post resolution comments on rows.
Summarize discussions about launch tasks
What are people saying about the launch tasks?Pulls sheet discussions, summarizes key points.
Show the discussion thread on a blocked row
Show me the discussion thread on that blocked rowGets row-specific comments with participants.
Follow-up: Update the row based on the discussion decision
Update the row based on what was decidedFind all unresolved discussions in the project
Are there any unresolved discussions in this project?Scans all threads for open questions.
Identify the most active discussion contributors this week
Who has been most active in discussions this week?Summarizes participation across threads.
Extract all decisions made in a sheet discussions
Summarize all decisions made in discussions on this sheetExtracts decision points from comment threads.
Follow-up: Add a Decisions column with key discussion takeaways
Add a Decisions column with key takeawaysShow a row's full comments and history
What's the context on this row — comments and history?Combines cell history + discussion thread for full picture.
Request owner updates on all overdue rows
Start a discussion on each overdue row asking the owner for an updateCreates targeted row-level discussions with status request.
Post resolution comments on blocked item rows
Add a comment to the blocked items explaining the resolutionPosts resolution context to existing discussion threads.
Create a sheet-level sprint retrospective discussion
Create a sheet-level discussion for sprint retrospective notesStarts a new sheet-wide thread for team-level conversation.
Post a status comment on every milestone row
Post a status comment on every milestone rowBatch-creates comments on milestone-tagged rows.
Update an earlier comment with revised timeline
Update my earlier comment with the revised timelineEdits an existing comment (current user's comments only).
Delete resolved discussion threads from the last sprint
Clean up the resolved discussion threads from last sprintDeletes closed-out discussion threads after confirmation.
Remove outdated comments and re-post current info
Delete my outdated comments and re-post with current infoRemoves stale comments and adds fresh ones.
Comment on each row with its fix
After fixing blocked items, comment on each with the fixDocuments what was done to unblock each item.
Attach a supporting deck to the relevant comment
Attach the supporting deck to the comment that decided thisBinds the source-of-truth doc to the conversation that referenced it.
Summarize all discussions that include attachments
Pull every discussion that has an attachment, summarize what each isAudit of where evidence has been posted into conversations.
Evidence and attachments
The following prompts inventory, attach, replace, and audit files across sheets, rows, comments, and workspaces for complete evidence trails.
Why this category exists. The agent now reads and writes the file layer of the work surface, not just the grid. Every write workflow can now ship with its evidence trail. Every read workflow can now pull in the source-of-truth docs that anchor the data.
List all files attached to this sheet
What files are attached to this sheet?Inventory the supporting evidence.
Pull a complete evidence trail for a row
Pull the full evidence trail on this row — files, links, and discussion attachmentsCombines row, comment, and discussion attachments into a single view.
Attach a Drive doc to the project tracker
Attach this Drive doc to the project trackerSheet-level evidence attach.
Attach a vendor email to relevant rows
Attach the vendor email to each row that mentions themPer-row evidence attach across a filtered set.
Attach a supporting one-pager to a specific comment
Attach the supporting one-pager to the comment that referenced itComment-level evidence attach — anchors decisions to source docs.
Find rows missing required attachments
Find every row across this sheet that's missing a required attachmentAudits for evidence gaps row-by-row.
Identify attachments older than six months
Which attachments on this sheet are stale — older than 6 months?Pulls attachment metadata, identifies aging files for refresh or cleanup.
Replace an outdated draft attachment with the final version
Delete the outdated draft attachment and replace it with the final versionLifecycle management — swap stale evidence for current.
Build a workspace-wide attachment index
Build a single index of every attachment across this workspaceCross-sheet attachment inventory.
Find sheets sharing the same Drive folder attachment
Find sheets where the same Drive folder is attached — they're relatedCross-portfolio evidence overlap detection.
Attach a sent stakeholder email as communication proof
Attach a copy of the sent stakeholder email to the sheet as proof of communicationClosing the loop — outbound communication becomes attached evidence.
Attach an audit log before and after cleanup
Attach the audit log to the sheet before after the cleanup so the trail is completeTwo-sided governance attach — pre and post snapshots.
Dashboards and visibility
The following prompts list, read, validate, and summarize dashboards, their source data, KPIs, and widget freshness.
List all accessible dashboards
What dashboards do I have access to?Lists all dashboards with names, IDs, and modification dates.
Show the executive portfolio dashboard structure and data
Show me the executive portfolio dashboardPulls dashboard structure, widget layout, and source data.
List dashboard source sheets
What sheets and reports feed into this dashboard?Maps dashboard widgets back to their source sheets and reports.
Read ops dashboard KPIs and explain them
Pull the KPIs from my ops dashboard and explain what they showReads widget data and synthesizes key performance metrics.
Check if dashboard data is current or stale
Is the dashboard data current or stale?Checks dashboard modification dates against source sheet activity.
Validate dashboard metrics against its raw sheet data
Compare what the dashboard shows vs the raw sheet dataValidates dashboard metrics against source-of-truth sheets.
Find all dashboards referencing a specific sheet
Which dashboards reference this sheet?Scans dashboard widgets to find all consumers of a specific sheet.
Build a directory of all dashboard purposes
Summarize all my dashboards — what does each one track?Lists dashboards then reads each to build a directory.
Draft board summary from dashboard widget data
Use the dashboard data to draft a board-ready summarySynthesizes dashboard widget data into executive narrative.
Identify dashboard widgets with stale data
Which dashboard widgets show stale data and need a refresh?Cross-references widget timestamps with source sheet versions.
Reports and cross-sheet analysis
The following prompts list, filter, and act on report data spanning multiple source sheets for portfolio-level analysis.
List all accessible reports
What reports do I have access to?Lists all reports with names and descriptions.
Pull and read the cross-project status report
Pull the cross-project status reportReads report data spanning multiple source sheets.
Filter a portfolio report for overdue items
Show me all overdue items from the portfolio reportFilters report data for Due Date
Attach supporting docs to each source row from a report
Pull the report and attach the supporting docs back to each source rowCloses the loop — report findings get evidence anchored on source sheets.
Use report to scope and stage a bulk update
Use the report to scope a bulk update, then stage it before applyingReport-driven write with staging discipline.
Multi-step workflow chains
Here are some commonly used prompt sequences to complete tasks.
- Find at-risk items → update status → comment what changed → attach the supporting doc → verify version delta
- Scan data quality → preview the diff → fix inconsistencies → confirm version delta and re-pull report
- Pull cross-sheet report → scope and stage the changes → update source sheets → start discussion threads with attached evidence
- Review dashboard metrics → identify problems in source → fix rows → add context → attach the source data extract
- Search for sheets → cross-reference data → create consolidated tracker → attach source sheet links to each row
- Pull blocked items → read discussions and attached evidence → post status comments → reassign or escalate
- Create new sheet → add rows and columns → attach project brief and spec → move to proper workspace folder
- Review completed work → calculate velocity → post retro comments → add next sprint tasks
- Pull report data → cross-reference dashboard → draft executive communication → attach to source sheet as proof
- Capture pre-version → run change on one canary row → verify behavior → run on remainder → confirm post-version
- Add proposed-value column → populate → wait for human review → promote to real column → drop the shadow