Set up a project list to provision projects in Advanced Portfolios

Customize your project list to define the data you want to collect for every new project. When you’re ready, provision new projects directly from the project list. 

Who can use this?

Plans:

  • Enterprise
  • Advanced Work Management

Configure your project list

The project list functions like a standard sheet. You can add and remove columns as needed, and you can use it as the source of reports or in combination with Dynamic View and Data Shuttle, among others.

There are four system-generated columns in the project list that you need to keep at all times: Project Name, Project Template, Workspace Status, and Project Leads. 

  1. Project Name. This column displays the name of each project workspace. When you provision a project, the project workspace is hyperlinked to its corresponding row in the Project Name column.
  2. Project Template. This is the set of items created in each project workspace. This column is a single-select dropdown. The options in the dropdown update automatically as you include new project template sets. 

Once you've provisioned a project with a specific project template, you may not change the template set.

  1. Workspace Status. This is a single-select dropdown column that shows you the status of the project workspace. A blank status means you haven't created a workspace, Active means you've provisioned the project, and Archived means you've archived the project.
  2. Project Leads. This is a multi-select contact column that you can use to share the project. After you've provisioned a project, all contacts in the Project Leads column are shared as Admins to the project workspace. To remove someone as Admin, remove them from the Project Leads column. 

Provision a project

The Project Name and Project Template columns must have values in them before you can provision a project.

There are two ways to provision a project, depending on the view you’re using:

Via Table view

  1. If this is your first project, simply edit the Project Name column in the project list and select a template. You can use the Starter project template or create your own. 

Project list view in Table view with Project Name column selected.

Learn more about how to create templates for Advanced Portfolios. 

2. Update the Workspace Status column from blank to Active. 

Brandfolder Image
The project list open in Table view showing the Workspace Status column dropdown with Active as the selected option.

By doing this, the system creates the project workspace with all the items included in the template. Use the hyperlink in the Project Name column to access the project workspace.

To provision additional projects, select the row directly below your last project, enter a project name, select a template, and set the workspace status to Active. 

Via List view

If this is your first project, select the system-created project to open the right panel and customize the project details. 

Brandfolder Image
Project list open in List view showing the Details panel for a project not yet activated.

Then, change the Workspace Status field to Active or use the Activate button to provision your project. Alternatively, you could also use the Activate icon in the project row (checkmark icon). 

Brandfolder Image
Project list open in list view showing details panel and three purple arrows showing three ways to activate project, Activate button, activate icon, and workspace status as active.

To provision additional projects, select +Add project at the top of your project list, enter a project name, select a template, and set the Workspace Status to Active. 

Customize fields in your project list

Use the toolbar in list view to open the Fields panel and rearrange or hide fields in the project list.

Fields panel 

The Fields button opens the Fields panel, where you can see all fields displayed. In the Fields panel, toggle on or off the fields that you’d like to display or hide. 

You can also drag and drop fields to rearrange their order in the project list

Brandfolder Image
Project list view with a purple arrow pointing at the Fields button and the Fields panel is open to display the list of fields with their toggles on.

To add more fields, switch to Table view and add new columns to the project list.